San Bernardino, CA β€” Permit Thresholds

When You Need
a Permit in San Bernardino

San Bernardino enforces the currently adopted California Building Code (CBC) and California Fire Code (CFC), with fire plan review handled by the San Bernardino County Fire Protection District under its own Standard S-1 for High Pile Combustible Storage. The city's building permit and the county fire district's high pile review are two separate submittals to two separate agencies β€” a distinction that catches many incoming warehouse operators.

Permit Type Trigger Authority
Building Permit Racking over 5'9" in height, OR any racking anchored to the slab regardless of height San Bernardino Building & Safety
(909) 384-5071
Fire / High Pile Permit Top-of-load exceeds 12 feet for standard commodities, OR 6 feet for high-hazard commodities (Group A plastics, rubber tires, aerosols, idle pallets), AND storage area exceeds 500 sq ft San Bernardino County Fire
Community Safety Division: (909) 386-8400
No Permit Required Racking under 5'9" that is not anchored to the slab β€” per CBC Β§105.2, Item 13 Exemption only applies to nonfixed, movable racking
Sources: 2022 California Building Code Β§105.2 Item 13 (codes.iccsafe.org) Β· California Fire Code Chapter 32 Β· City of San Bernardino Building & Safety Division: sbcity.org β€” Building & Safety Β· (909) 384-5071
Critical Detail Most Operations Miss

Top-of-Load Height
vs. Rack Height

The fire code threshold is based on top-of-load height β€” the highest point your stored product reaches, including the pallet. This is not the same as rack height or upright height.

A facility can have 20-foot rack uprights but keep top-of-load at 11 feet β€” and avoid the high pile fire permit entirely for standard commodities. Conversely, a facility can have 14-foot uprights with product stacked to 12'1" and immediately trigger the requirement.

This distinction matters enormously for how you configure your racking system from day one β€” and it's the most common compliance gap we see across San Bernardino's Alliance California / former Norton corridor and the Interstate 10 and 215 distribution market.

Group A Plastics β€” The 6-Foot Rule

If you store products with synthetic materials β€” athletic footwear, consumer electronics, plastic packaging, foam products, or similar goods β€” your commodity may classify as Group A plastics under NFPA 13. The high pile fire permit threshold for Group A plastics drops to 6 feet of top-of-load height, not 12 feet. Most warehouses storing these goods are unaware their current sprinkler system may be inadequate for rack storage above that height.

Two Departments. Two Separate Reviews.

Building Dept vs.
Fire Department

In San Bernardino, the City Building & Safety Division reviews the structural side while the San Bernardino County Fire Protection District's Community Safety Division reviews high pile life safety under Standard S-1. These are two different agencies with two different submittals β€” clearing one does not clear the other.

Building Department

Structural Review

  • Slab PSI and anchor adequacy
  • Seismic load calculations (CBC Β§1613)
  • Rack engineering drawings (ANSI MH16.1)
  • Frame and beam load ratings
  • Base plate and anchor specifications
  • CAD layout with aisle widths and dimensions
Fire Prevention

Life Safety Review

  • Top-of-load height verification
  • Commodity classification (CFC Chapter 32)
  • Sprinkler system adequacy (NFPA 13)
  • Transverse and longitudinal flue spaces
  • Aisle width and fire department access
  • High pile storage signage requirements
City of San Bernardino Building & Safety Division: sbcity.org β€” Building & Safety Β· San Bernardino County Fire Protection District: sbcfire.org β€” Fire Plan Reviews
The Permit Process

What to Expect
in San Bernardino

1

Pre-Project Assessment

Walk the facility and establish top-of-load height, commodity classification, existing sprinkler design density (from the riser placard), and slab PSI. These four data points determine which permits are required before a single drawing is started.

2

Engineering Package

A licensed engineer prepares stamped CAD drawings, seismic calculations per CBC Β§1613 and ASCE-7, anchor details, and rack load ratings per ANSI MH16.1. San Bernardino sits near the convergence of the San Andreas and San Jacinto fault systems in one of the highest seismic design categories in the state β€” this step is mandatory, not optional.

3

Dual Submission

The county fire district requires all plans to be submitted electronically through the County's EZOP Online Permitting Portal. High pile plan review applies to any storage of 500 square feet or greater of Class I–IV commodities, and any quantity of high-hazard commodities. San Bernardino County Fire Standard S-1 governs the specifics β€” pull it before you draw. The city building permit is a separate submittal to San Bernardino Building & Safety.

4

Plan Review and Corrections

The San Bernardino County Fire Protection District publishes a plan-check turnaround goal of 15 working days after payment is received, and reviews independently of the city building permit. Because two agencies are involved, sequencing matters β€” starting both tracks early, rather than serially, is the single biggest schedule lever. Missing seismic calculations and unclear commodity classifications remain the most common correction items.

5

Installation and Inspection

Installation must follow approved drawings exactly. Anchor inspection by a licensed inspector is required. Final inspection by both Building and Fire before the permit closes. Load capacity signage must be installed and visible before final sign-off.

Common Questions β€” San Bernardino, CA

What San Bernardino Warehouse
Operators Ask Us

Who reviews high pile storage in the City of San Bernardino β€” the city or the county?
The San Bernardino County Fire Protection District (SBCFPD) handles fire and high pile plan review, even for locations inside the City of San Bernardino, under its own Standard S-1. Your building permit goes to the City of San Bernardino Building & Safety Division. So a single warehouse project involves two agencies: the city for the building side, the county fire district for the fire side.
What is San Bernardino County Fire Standard S-1?
Standard S-1 is the county fire district's written standard specifically for high pile combustible storage. It applies to all storage occupancies designated as high pile per the currently adopted California Fire Code Chapter 32, plus the district's own code and standards. It's the document your fire plan check is measured against β€” and it can be modified by the district's code official, so confirm the current version with the Community Safety Division at (909) 386-8400 before relying on an old copy.
How do I submit high pile plans in San Bernardino?
The county fire district requires electronic submittal through the County's EZOP Online Permitting Portal β€” paper submittals aren't the path. High pile review is triggered by 500 square feet or more of Class I–IV commodities, or any quantity of high-hazard commodities. The plan-check turnaround goal is 15 working days after payment is received.
Does racking height mean the top of the upright or the top of what I store?
For fire permit purposes it is the top of what you store β€” the top-of-load height including the pallet. For building permit purposes, racking height generally refers to the upright height. Both matter but they trigger different requirements. Confirm both measurements before assuming you're below any threshold.
My racking is already installed without a permit. What now?
The permit requirement applies retroactively to unpermitted racking. The path forward is submitting as-built drawings to San Bernardino Building & Safety and a Standard S-1 high pile submittal through the county fire district's EZOP portal. Addressing it proactively is always less costly than having it flagged during an unrelated inspection or an insurance audit.
Inland Empire & SoCal Coverage

We Also Serve
These Cities

Ontario Riverside San Diego Fontana Moreno Valley Perris Corona Chino Rancho Cucamonga Colton Eastvale All Permit Info β†’
Free Permit Review

We assess your San Bernardino facility's compliance status β€” no cost, no obligation.

Or call us directly
(951) 297-7929

πŸ”’ No spam. No bots. Real conversations only. Response within one business day.

Request Received

We'll reach out within one business day to review your San Bernardino facility's permit status.

Operating without a permit
in San Bernardino is a risk you don't need.

Free compliance review. No cost. No obligation. We come to you.

Schedule Free Review πŸ“ž (951) 297-7929